Network and connectivity

Networks designed before they are cabled

Most network problems are design problems that were cheap to avoid and expensive to fix. We plan addressing, segmentation and capacity first, then install and document to a standard your next engineer can follow.

Fibre network connections lit up across a dark surface

Design, deploy, document

A network is the one piece of infrastructure every other system depends on, and the one most often assembled incrementally until nobody can say with confidence what is connected to what. We start with an assessment — users, applications, bandwidth, growth, availability — and produce a design before any cable is pulled.

What we deploy

Switching, cabling and connectivity

Managed switching

Layer 2 and Layer 3 managed switches in 8, 16, 24 and 48-port configurations, with redundant designs where availability requires it.

PoE and PoE+

Powering access points, cameras and IP phones from the switch, sized to the actual load rather than the port count.

Fibre and uplinks

Fibre optic runs, SFP and SFP+ transceivers and uplink design between floors, buildings and the core.

Structured cabling

CAT6 and CAT6A, patch panels, keystone modules, patch cords, cable management, racks and cabinets.

Testing and labelling

Every run tested and labelled. An unlabelled patch panel costs more over its life than the labelling did.

Documentation

Topology diagram, IP addressing and VLAN register, switch configuration records and configuration backups.

What the engagement covers

  • Site survey and assessment of existing cabling, equipment and capacity
  • LAN and WAN design with IP addressing and subnet planning
  • VLAN and security-zone design
  • Managed switch configuration and routing between networks
  • Fibre and structured cabling deployment coordination
  • Wi-Fi coverage planning and guest network isolation
  • Network device hardening and secure administrative access
  • Network documentation and handover

Common questions

Can you work in an occupied office?

Yes. Cabling and cutovers are normally scheduled out of hours or in phases so that a floor is never fully down. The plan is agreed before work starts, with a rollback for each step.

CAT6 or CAT6A?

It depends on run lengths, the speeds you expect to need and whether PoE heat is a factor. CAT6A costs more to buy and install and is harder to terminate well; it is the right answer in some buildings and over-specification in others. We will tell you which yours is.

Do you handle the electrical work?

Electrical, civil and HVAC work generally requires a qualified contractor and is quoted separately. We coordinate with them rather than pretending it is in scope.

Talk about your network

Tell us the site size, rough user count and what is going wrong today.

  • Reply within one working day
  • Site survey before any bill of materials

We use your details only to reply to you. See our privacy policy.

Need a consultation?

Tell us what you are building.

Share the problem, the platform and the deadline. We will come back with an approach, a team and an estimate.