Compliance and data integrity

Validation support that stays risk-based

Validation should be proportionate to risk, not documentation for its own sake. We supply the technical half of the package — design specifications, installation evidence, test records, configuration documentation — while approval and release stay with your QA.

Validation documentation being reviewed

Risk-based, not documentation for its own sake

A validation programme that produces binders nobody reads is a cost without a benefit. A risk-based approach — GAMP 5 style — concentrates effort where a failure would actually affect product quality, patient safety or data integrity, and keeps the rest proportionate.

Terminology such as IQ, OQ and PQ may or may not suit a given system and quality framework. We work to yours.

The lifecycle

From business need to retirement

  1. Assess

    Business need, GxP and regulatory assessment, risk assessment.

  2. Specify

    User requirements, supplier assessment, design and configuration specification.

  3. Verify

    Installation verification, functional and operational testing, user and process testing.

  4. Release

    Traceability, validation summary and release authorization.

  5. Maintain

    Change control, periodic review and eventual retirement.

The package

Validation documents we can help produce or supply input to

  1. Assessments

    System classification, GxP applicability, Part 11 assessment, data-integrity risk assessment and supplier assessment.

  2. Plans and requirements

    Validation plan and user requirements specification.

  3. Specifications

    Functional and configuration documentation, and the infrastructure or design specification — the part we own outright.

  4. Evidence

    Installation evidence, test scripts and results, deviations and requirements traceability.

  5. Closure

    Validation summary report and release authorization.

  6. Operation

    SOPs, training records, backup and restore verification and security assessment.

  7. Ongoing

    Periodic review records and retirement or decommissioning records.

Changes that should not happen informally

  • Operating system patches on validated or instrument-connected systems
  • Application upgrades and database upgrades
  • Server migrations and configuration changes
  • Firewall and network changes affecting validated systems
  • New interfaces between systems
  • LIMS workflow and user-role changes
  • Antivirus or EDR changes affecting instrument systems

Common questions

Can you validate our LIMS for us?

We can provide substantial technical input — infrastructure and configuration specifications, installation evidence, test execution support, backup and restore verification and security assessment. We cannot own validation approval or release: those are QA decisions under your quality system, and a supplier signing them off would defeat the purpose.

When should validation start?

Earlier than most laboratories start it, and certainly not just before the first sponsor audit. Retrofitting evidence for a system that has been in production for two years is far more expensive than producing it as you deploy.

Do we need to validate the infrastructure as well as the applications?

Critical supporting infrastructure usually warrants qualification proportionate to its impact — the network, servers, backup and time synchronisation that regulated applications depend on. The depth follows from your risk assessment.

Where our responsibility ends

Pracoda provides technical infrastructure implementation and Computerized System Validation documentation support. Validation strategy, acceptance, approval, SOP approval, data review and final quality release remain with the client's authorized QA, system owner or qualified regulatory and validation specialists. Regulatory applicability depends on the client's intended use, quality system and applicable regulations.

Talk about your validation programme

Tell us which systems you need to validate and whether a quality system is already in place. We will tell you what we can take on and what has to stay with your QA.

  • Reply within one working day
  • Risk-based, proportionate scope

We use your details only to reply to you. See our privacy policy.

Need a consultation?

Tell us what you are building.

Share the problem, the platform and the deadline. We will come back with an approach, a team and an estimate.