Validation support that stays risk-based
Validation should be proportionate to risk, not documentation for its own sake. We supply the technical half of the package — design specifications, installation evidence, test records, configuration documentation — while approval and release stay with your QA.

Risk-based, not documentation for its own sake
A validation programme that produces binders nobody reads is a cost without a benefit. A risk-based approach — GAMP 5 style — concentrates effort where a failure would actually affect product quality, patient safety or data integrity, and keeps the rest proportionate.
Terminology such as IQ, OQ and PQ may or may not suit a given system and quality framework. We work to yours.
From business need to retirement
Assess
Business need, GxP and regulatory assessment, risk assessment.
Specify
User requirements, supplier assessment, design and configuration specification.
Verify
Installation verification, functional and operational testing, user and process testing.
Release
Traceability, validation summary and release authorization.
Maintain
Change control, periodic review and eventual retirement.
Validation documents we can help produce or supply input to
Assessments
System classification, GxP applicability, Part 11 assessment, data-integrity risk assessment and supplier assessment.
Plans and requirements
Validation plan and user requirements specification.
Specifications
Functional and configuration documentation, and the infrastructure or design specification — the part we own outright.
Evidence
Installation evidence, test scripts and results, deviations and requirements traceability.
Closure
Validation summary report and release authorization.
Operation
SOPs, training records, backup and restore verification and security assessment.
Ongoing
Periodic review records and retirement or decommissioning records.
Changes that should not happen informally
- Operating system patches on validated or instrument-connected systems
- Application upgrades and database upgrades
- Server migrations and configuration changes
- Firewall and network changes affecting validated systems
- New interfaces between systems
- LIMS workflow and user-role changes
- Antivirus or EDR changes affecting instrument systems
Common questions
Can you validate our LIMS for us?
We can provide substantial technical input — infrastructure and configuration specifications, installation evidence, test execution support, backup and restore verification and security assessment. We cannot own validation approval or release: those are QA decisions under your quality system, and a supplier signing them off would defeat the purpose.
When should validation start?
Earlier than most laboratories start it, and certainly not just before the first sponsor audit. Retrofitting evidence for a system that has been in production for two years is far more expensive than producing it as you deploy.
Do we need to validate the infrastructure as well as the applications?
Critical supporting infrastructure usually warrants qualification proportionate to its impact — the network, servers, backup and time synchronisation that regulated applications depend on. The depth follows from your risk assessment.
Where our responsibility ends
Pracoda provides technical infrastructure implementation and Computerized System Validation documentation support. Validation strategy, acceptance, approval, SOP approval, data review and final quality release remain with the client's authorized QA, system owner or qualified regulatory and validation specialists. Regulatory applicability depends on the client's intended use, quality system and applicable regulations.
Talk about your validation programme
Tell us which systems you need to validate and whether a quality system is already in place. We will tell you what we can take on and what has to stay with your QA.
- Reply within one working day
- Risk-based, proportionate scope